Saturday, 22 February 2025
Home Topics Business Valero plans to run refineries at 92% of combined capacity in Q3 2024
BusinessFuelLiquefied Petroleum GasNewsOil

Valero plans to run refineries at 92% of combined capacity in Q3 2024

179
FILE PHOTO: A Valero logo is seen at a Valero gas station in Hoboken, New Jersey, U.S., May 2, 2016. REUTERS/Mike Segar/File Photo
A Valero logo is seen at a Valero gas station in Hoboken, New Jersey, U.S., May 2, 2016. —REUTERS/Mike Segar/File Photo

HOUSTON U.S. refiner Valero Energy Corp plans to operate its 14 refineries up to 92% of their combined 3.2 million barrel-per-day (bpd) total throughput capacity in the third quarter of 2024, according to plans announced by Homer Bhullar, vice president of investor relations.

The San Antonio-based company, which is the second largest U.S. refiner, plans for its seven U.S. Gulf Coast refineries to operate between 95% ad 98% of their combined total throughput of 1.8 million bpd, Bhullar said during a conference call on Thursday.

During the second quarter, Valero’s refineries ran at 94% of their combined total throughput capacity, Bhullar said.

Greg Bram, vice president of refining services, said the company’s third-quarter production projections “considers planned maintenance activity we have planned in the quarter, particularly if you take a look at the North Atlantic region.”

Valero’s two North Atlantic refineries are based in Quebec and Wales.

Chief Operating Officer Gary Simmons said gasoline demand was similar to 2023.

“I guess the way we’re looking at it as we say, year over year, gasoline demand in the U.S. is flat, Simmons said.

The company has also seen weaker demand for jet fuel, Simmons said.

“If you look at year to date, diesel sales in the daily data would suggest a decline in diesel demand of about 100,000 barrels,” he said. “However, you know, a lot of that has been offset to date with the increase in jet demand. So maybe distillate demand is down slightly.”

Chief Executive Lane Riggs said the company’s joint venture Diamond Green Diesel renewable distillate plant at the 360,000-bpd Port Arthur, Texas refinery remains on schedule to begin production in the fourth quarter of this year.

In addition to diesel fuel, the plant will produce sustatinable aviation fuel, Riggs said.

(Reporting by Erwin Seba)

Related Articles

First Minister John Swinney was shown a hydrogen gas cooker during the visit (Jane Barlow/PA)
ClimateHydrogen

Swinney: Hydrogen-powered home is ‘exciting’ development in climate change fight

John Swinney says the opening of the first hydrogen-powered homes at a...

FILE PHOTO: People walk past an installation depicting barrel of oil with the logo of Organization of the Petroleum Exporting Countries (OPEC) during the COP29 United Nations climate change conference in Baku, Azerbaijan November 19, 2024. REUTERS/Maxim Shemetov/File Photo
BusinessOilPoliticsTrade

OPEC+ likely to stick to oil output hike plan, sources say

By Maha El Dahan, Ahmad Ghaddar and Olesya Astakhova LONDON (Reuters) -OPEC+...

FILE - People walk amid an oil spill in the Niger Delta in village of Ogboinbiri, Nigeria, Dec. 11, 2024. (AP Photo/Sunday Alamba, File)
BusinessEconomyOilPolitics

Nigeria moves to restart oil production in vulnerable region after Shell sells much of its business

ABUJA, Nigeria (AP) — The Nigerian government is in talks with local...

FILE PHOTO: Republican presidential nominee and former U.S. President Donald Trump makes a campaign stop at manufacturer FALK Production in Walker, Michigan, U.S. September 27, 2024.  REUTERS/Brian Snyder/File Photo
BusinessEconomyIndustryInfrastructurePoliticsTrade

US metal buyers likely to turn to Mideast, Chile as tariffs bite

By Melanie Burton MELBOURNE (Reuters) -U.S. companies will look to the Middle...

Login into your Account

Please login to like, dislike or bookmark this article.