Monday, 20 January 2025
Home News Factbox: Kursk has one of Russia’s top atomic power stations
NewsNuclear Power

Factbox: Kursk has one of Russia’s top atomic power stations

64
Russian President Vladimir Putin chairs a meeting on situation in Belgorod, Kursk and Bryansk regions following an incursion of Ukrainian troops in the course of Russia-Ukraine conflict, via video link at the Novo-Ogaryovo state residence outside Moscow, Russia August 22, 2024. Sputnik/Gavriil Grigorov/Pool via REUTERS
Russian President Vladimir Putin chairs a meeting on situation in Belgorod, Kursk and Bryansk regions following an incursion of Ukrainian troops in the course of Russia-Ukraine conflict, via video link at the Novo-Ogaryovo state residence outside Moscow, Russia August 22, 2024. Sputnik/Gavriil Grigorov/Pool via REUTERS

MOSCOW – President Vladimir Putin accused Ukraine on Thursday of trying to strike Russia’s Kursk nuclear power station in an overnight attack.

He provided no documentary evidence to back up his assertion and there was no immediate comment from Ukraine.

Here are some details about the plant.

  • The Kursk plant is one of Russia’s top nuclear power stations. It supplies about half of the electricity used in the Black Earth region of southern Russia.
  • It is located on the Seym River near the town of Kurchatov, named after Soviet nuclear physicist Igor Kurchatov, in Russia’s western region of Kursk. Ukrainian forces launched a cross-border incursion in the Kursk region on Aug. 6.
  • The plant has four Soviet graphite-moderated RBMK-1000 reactors – the same design as those at the Chernobyl nuclear plant which in 1986, when part of the Soviet Union, became the scene of the world’s worst nuclear disaster.
  • Reactor Number 1, which dates from 1976, was shut down at the Kursk plant in 2021 to operate in non-generation mode. Reactor Number 2, which dates from 1979, was shut down in 2024. Reactor Number 3, from 1983, and Reactor Number 4, from 1985, are both operational.
  • Construction of Kursk-2, essentially new reactors of the VVER-TOI type, was begun in 2018. The two reactors are not operational yet.

Related Articles

President Donald Trump and Vice President JD Vance listen to Christopher Macchio sing during the 60th Presidential Inauguration in the Rotunda of the U.S. Capitol in Washington, Monday, Jan. 20, 2025.     Julia Demaree Nikhinson/Pool via REUTERS
BusinessPolitics

Trump says will declare ‘national energy emergency’ that could boost fossil fuels, power projects

Donald Trump will sign an executive order declaring a national energy emergency...

FILE PHOTO: The Chevron logo is pictured after the U.S. government granted a six-month license allowing Chevron to boost oil output in U.S.-sanctioned Venezuela, in Caracas, Venezuela, December 2, 2022. REUTERS/Gaby Oraa/File Photo
BusinessFuelNatural GasOilTrade

Chevron expresses interest in Greek energy exploration

The Greek energy ministry said that it would issue a decision this...

FILE PHOTO: The Rocky Mountains are pictured as a layer of air pollution hangs over Denver, Colorado, U.S. January 21, 2020. Picture taken January 21, 2020. REUTERS/Jim Urquhart/File Photo
ClimatePolitics

Trump to withdraw from Paris climate agreement, White House says

U.S. President Donald Trump will withdraw from the Paris climate agreement, according...

FILE PHOTO: The logo of Ford is seen on a car in Brussels, Belgium January 16, 2025. REUTERS/Johanna Geron/File Photo
Electric Vehicles (EVs)Regulations

US upgrades probe into 129,000 Ford vehicles over hands-free tech

The regulator said it is upgrading the probe to an engineering analysis,...

Login into your Account

Please login to like, dislike or bookmark this article.