Monday, 3 February 2025
Home Subsea7 awarded contract on Gulf of Mexico project

The following content is a news release issued by and distributed by . The original news release may be found here.

Subsea7 awarded contract on Gulf of Mexico project

Luxembourg – 16 August 2024 - Subsea7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a sizeable(1) contract in the US Gulf of Mexico.

The scope of work includes engineering, procurement, construction, and offshore installation of a water injection flowline, hull piping, and associated subsea infrastructure.

Project management and engineering work will start immediately at Subsea7’s office in Houston, Texas, and offshore activity is expected to begin in 2026.

(1) Subsea 7 defines a sizeable contract as being between USD 50 million and USD 150 million.

*******************************************************************************

Subsea7 is a global leader in the delivery of offshore projects and services for the evolving energy industry, creating sustainable value by being the industry’s partner and employer of choice in delivering the efficient offshore solutions the world needs.

Subsea7 is listed on the Oslo Børs (SUBC), ISIN LU0075646355, LEI 222100AIF0CBCY80AH62.

*******************************************************************************

Contact for investment community enquiries:

Katherine Tonks
Investor Relations Director
Tel +44 20 8210 5568
ir@subsea7.com

Contact for media enquiries:

Ashley Shearer

Communications Manager

Tel +17133006792

ashley.shearer@subsea7.com

Forward-Looking Statements: This document may contain ‘forward-looking statements’ (within the meaning of the safe harbour provisions of the U.S. Private Securities Litigation Reform Act of 1995). These statements relate to our current expectations, beliefs, intentions, assumptions or strategies regarding the future and are subject to known and unknown risks that could cause actual results, performance or events to differ materially from those expressed or implied in these statements. Forward-looking statements may be identified by the use of words such as ‘anticipate’, ‘believe’, ‘estimate’, ‘expect’, ‘future’, ‘goal’, ‘intend’, ‘likely’ ‘may’, ‘plan’, ‘project’, ‘seek’, ‘should’, ‘strategy’ ‘will’, and similar expressions. The principal risks which could affect future operations of the Group are described in the ‘Risk Management’ section of the Group’s Annual Report and Consolidated Financial Statements. Factors that may cause actual and future results and trends to differ materially from our forward-looking statements include (but are not limited to): (i) our ability to deliver fixed price projects in accordance with client expectations and within the parameters of our bids, and to avoid cost overruns; (ii) our ability to collect receivables, negotiate variation orders and collect the related revenue; (iii) our ability to recover costs on significant projects; (iv) capital expenditure by oil and gas companies, which is affected by fluctuations in the price of, and demand for, crude oil and natural gas; (v) unanticipated delays or cancellation of projects included in our backlog; (vi) competition and price fluctuations in the markets and businesses in which we operate; (vii) the loss of, or deterioration in our relationship with, any significant clients; (viii) the outcome of legal proceedings or governmental inquiries; (ix) uncertainties inherent in operating internationally, including economic, political and social instability, boycotts or embargoes, labour unrest, changes in foreign governmental regulations, corruption and currency fluctuations; (x) the effects of a pandemic or epidemic or a natural disaster; (xi) liability to third parties for the failure of our joint venture partners to fulfil their obligations; (xii) changes in, or our failure to comply with, applicable laws and regulations (including regulatory measures addressing climate change); (xiii) operating hazards, including spills, environmental damage, personal or property damage and business interruptions caused by adverse weather; (xiv) equipment or mechanical failures, which could increase costs, impair revenue and result in penalties for failure to meet project completion requirements; (xv) the timely delivery of vessels on order and the timely completion of ship conversion programmes; (xvi) our ability to keep pace with technological changes and the impact of potential information technology, cyber security or data security breaches; (xvii) global availability at scale and commercially viability of suitable alternative vessel fuels; and (xviii) the effectiveness of our disclosure controls and procedures and internal control over financial reporting. Many of these factors are beyond our ability to control or predict. Given these uncertainties, you should not place undue reliance on the forward-looking statements. Each forward-looking statement speaks only as of the date of this document. We undertake no obligation to update publicly or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

This information is considered to be inside information pursuant to the EU Market Abuse Regulation and is subject to the disclosure requirements pursuant to Section 5-12 the Norwegian Securities Trading Act.

This stock exchange release was published by Katherine Tonks, Investor Relations, Subsea7, on 16 August 2024 at 08:15 CET.

Attachment ...


Read the full news release here

Related Articles

A dumper unloads coal at a coal yard at the Deendayal Port in Kandla, in the western state of Gujarat, India, September 25, 2024. REUTERS/Amit Dave/File Photo
CoalEmissions

Opinion: India’s lower coal imports mean bad news for power emissions

By Gavin Maguire LITTLETON, Colorado (Reuters) -India lowered imports of thermal coal...

FILE PHOTO: Snow capped mountains are reflected in Kenai Lake outside of Cooper Landing, in Anchorage, Alaska, U.S., November 3, 2021. Picture taken November 3, 2021. REUTERS/Shannon Stapleton/File Photo
EconomyLiquefied Natural GasPoliticsTrade

Japan weighs Alaska LNG pipeline pledge to win Trump’s favour

By Tim Kelly, Yukiko Toyoda, John Geddie TOKYO (Reuters) -Japan is considering...

FILE - A boat passes by July 2, 2024, off Sea Girt, N.J., where a power cable from the Atlantic Shores offshore wind farm project is projected to come ashore. (AP Photo/Wayne Parry, File)
ElectricityOffshore WindPoliticsWind

In win for Trump, oil giant Shell walks away from major New Jersey offshore wind farm

In the first serious fallout from President Donald Trump’s early actions against...

FILE PHOTO: A pump is seen at a gas station in Manhattan, New York City, U.S., August 11, 2022. REUTERS/Andrew Kelly/File Photo
FuelOilPoliticsTrade

Oil prices rise amid US tariff threat but still set for weekly loss

Trump has threatened to impose a 25% tariff as early as Saturday...

Login into your Account

Please login to like, dislike or bookmark this article.