Saturday, 18 January 2025
Home Topics Electricity China reports problems at five reservoirs in Tibet after earthquake
ElectricityHydropowerInfrastructureNewsUtilities

China reports problems at five reservoirs in Tibet after earthquake

7

BEIJING (Reuters) – Chinese authorities in Tibet have detected problems, including cracks, at five out of 14 hydropower dams that they have inspected since a magnitude 6.8 earthquake rocked the southwest region last week, an emergency official said on Thursday.

Of the five affected dams, three have since been emptied, the Tibet emergency management official told a press conference.

In the county of Tingri, the quake’s epicentre, the walls of one hydrodam have tilted, prompting the evacuation of about 1,500 people from six villages downstream to higher ground, he said.

At another hydrodam, monitoring devices have been installed as it is being drained.

The earthquake, which has killed at least 126 people and injured hundreds, was a reminder of the risks from a hydropower building spree by China and India in one of the world’s most remote, quake-prone regions.

Earthquakes have damaged dams in the past, particularly by setting off landslides and rockfalls. A massive earthquake in Nepal in 2015 shuttered almost a fifth of its hydropower for more than a year.

The Jan. 7 quake in Tibet, the fifth-deadliest in China since the 2008 Sichuan temblor, destroyed more than 3,600 houses and damaged religious structures, with aftershocks of up to 5.0 in magnitude still shaking the area.

Southwestern parts of China, Nepal and northern India are often hit by earthquakes caused by the collision of the Indian and Eurasian tectonic plates. Tingri, which sits atop the zone where the Indian plate pushes under Tibet, is particularly vulnerable.

(Reporting by Ryan Woo, Editing by David Goodman and Angus MacSwan)

Related Articles

FILE PHOTO: A drone view shows a site where beachfront houses were burnt down by the Palisades Fire, in Malibu, California, U.S., January 16, 2025. REUTERS/Mike Blake/File Photo
RegulationsUtilities

LA public utility’s wildfire liability hinges on equipment’s role, Moody’s says

Moody's says LADWP's liability for the Palisades Fire hinges on equipment involvement;...

U.S. President Joe Biden answers questions regarding talking to hostages and TikTok as he made a stop at St. John's Church before the U.S. Conference of Mayors in Washington D.C., U.S., January 17, 2025. REUTERS/Annabelle Gordon
Critical MineralsFinance

Biden boosts loan for ioneer’s Nevada lithium mine to nearly $1 billion

The U.S. DOE finalized a $996M loan for ioneer’s Rhyolite Ridge lithium...

FILE PHOTO: A coat of arms is seen on one of the original Bank of Montreal (BMO) buildings in Toronto, Ontario, Canada June 1, 2021.  REUTERS/Chris Helgren/File Photo
ClimateFinancePolitics

BMO becomes first Canadian bank to withdraw from Net-Zero Banking Alliance

BMO becomes the first Canadian bank to exit the NZBA, following similar...

Imperial Oil logo at the company's annual meeting in Calgary on April 28, 2017. THE CANADIAN PRESS/Jeff McIntosh
OilRegulations

Alberta Energy Regulator lays nine charges against Imperial Oil for 2023 spill

Alberta charges Imperial Oil over 5.3M-litre toxic wastewater spill at Kearl site,...

Login into your Account

Please login to like, dislike or bookmark this article.