Saturday, 21 December 2024
Home Analysis Opinion: Europe needs hybrid interconnectors for offshore wind
AnalysisEconomyElectricityInfrastructureOpinionPoliticsRegulationsTransmissionUtilitiesWind

Opinion: Europe needs hybrid interconnectors for offshore wind

112
Wind turbines in a body of water in Bruinisse, Netherlands. (Tom Swinnen/pexels.com)

Connecting offshore wind farms to more than one energy market at a time, through what are called hybrid interconnectors, could play a key role in Europe’s transition to renewable energy.

That point is made in an opinion piece by Catherine Vandenborre, who is the interim CEO of Belgian system operator Elia Group, and Olivia Breese, the executive vice-president for Europe at Ørsted, a Danish wind developer, published by the Energy Institute, a London-based professional membership organization for those who work in energy sectors.

So far there is only one project — the Kriegers Flak Combined Grid Solution in the Baltic Sea, which connects Germany to Denmark — that does this.

Organizations
Topics

They argue the existing regulatory framework does not ensure cost-sharing agreements that recognize the asymmetrical benefits and burdens of such projects across different countries and call for a better approach.

That is why international co-operation and a political focus on the issue from the European Union are so important here. If these asymmetrical benefits are not reflected in cost-sharing agreements, the acceleration that we need will be obstructed.

The development of an international mechanism may sound complex – but examples of cross-border critical infrastructure already exist and there can be no doubt that the benefits of resolving these regulatory and planning issues significantly outweigh their complexity, both in terms of the speed at which assets can be deployed and also in terms of the cost reduction potential.

“Making hybrids happen: the case for shared offshore interconnectors in Europe,” Catherine Vandenborre and Olivia Breese, Energy Institute, May 8, 2024.

Read the full report, “Making Hybrids Happen,” presented at the WindEurope conference in March 2024.

Read the opinion piece originally published by the Energy Institute on May 8, 2024.

Related Articles

FILE PHOTO: A man wearing an IG Metall (Industrial Union of Metalworkers) scarf holds a banner with the Volkswagen logo, as workers gather to strike against planned cuts to wages and possible factory closures, in Hanover, Germany, December 2, 2024. Picture taken with long exposure. REUTERS/Fabian Bimmer/File Photo
AutomotiveBusinessEconomyElectric Vehicles (EVs)IndustryLabourManufacturing

VW, union agree to cut 35,000 jobs in Germany, avert strikes

Volkswagen strikes deal with unions, avoiding mass strikes; plans 35,000 job cuts,...

The Sierra Nevada del Cocuy is located in the eastern ranges of the Colombian Andes (AFP)
ClimateEconomyEmissionsEnvironmentIndigenousMiningNatural GasOilPoliticsRegulations

Inter-American Court rules Colombia drilling violated native rights

The Inter-American Court ruled Colombia violated U'wa Indigenous rights by allowing resource...

BusinessClimateEconomyEmissionsEnvironmentNatural GasPoliticsRegulations

California regulators vote to delay closure of gas storage facility, site of worst US methane leak

California regulators delay Aliso Canyon gas facility closure, sparking debate over energy...

FILE - EPA Administrator Michael Regan stands near the Marathon Petroleum Refinery as he conducts a television interview, while touring neighborhoods that abut the refinery, in Reserve, La., Nov. 16, 2021. (AP Photo/Gerald Herbert, File)
ClimateEconomyEmissionsEnvironmentPolitics

EPA head Regan, who championed environmental justice, to leave office Dec. 31

Michael Regan, who has led the EPA throughout Biden's four-year term, said...

Login into your Account

Please login to like, dislike or bookmark this article.