Thursday, 21 November 2024
Home Subsea7 awarded a contract for the Bittern field in the UK North Sea

The following content is a news release issued by and distributed by . The original news release may be found here.

Subsea7 awarded a contract for the Bittern field in the UK North Sea

Luxembourg – 14 June 2024 - Subsea7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a sizeable1 contract by Dana Petroleum (E&P) Limited, for the Bittern field development, located approximately 190km east of Aberdeen in the UK Central North Sea, at a water depth of 90 metres.

The contract scope includes project management, engineering, procurement, construction and installation (EPCI) of a 22km 12” water injection pipeline. Subsea7’s scope also includes associated subsea structures and tie-ins at the Triton Floating Production Storage & Offloading (FPSO) vessel and the Bittern field.

Project management and engineering work will commence immediately in Aberdeen. The offshore activities are scheduled for Q3 2025.

Steve Wisely, Senior Vice President of UK and Global Inspection, Repair and Maintenance, Subsea7, said: "We are pleased that Dana Petroleum has chosen Subsea7 to provide project management expertise and engineering technical knowledge for this important field development. We look forward to supporting Dana in meeting their project objectives and for the opportunity to play a key role in the safe and successful completion of Bittern."

  1. Subsea7 defines a sizeable contract as being between $50 million and $150 million

*******************************************************************************
Subsea7 is a global leader in the delivery of offshore projects and services for the evolving energy industry, creating sustainable value by being the industry’s partner and employer of choice in delivering the efficient offshore solutions the world needs.

Subsea7 is listed on the Oslo Børs (SUBC), ISIN LU0075646355, LEI 222100AIF0CBCY80AH62.

*******************************************************************************

Contact for investment community enquiries:
Katherine Tonks
Investor Relations Director
Tel +44 20 8210 5568
ir@subsea7.com

Contact for media enquiries:
Michelle Wainwright

UK & Global IRM Communications Manager
Tel +44 (0)7876778370
Michelle.wainwright@subsea7.com

Forward-Looking Statements: This document may contain ‘forward-looking statements’ (within the meaning of the safe harbour provisions of the U.S. Private Securities Litigation Reform Act of 1995). These statements relate to our current expectations, beliefs, intentions, assumptions or strategies regarding the future and are subject to known and unknown risks that could cause actual results, performance or events to differ materially from those expressed or implied in these statements. Forward-looking statements may be identified by the use of words such as ‘anticipate’, ‘believe’, ‘estimate’, ‘expect’, ‘future’, ‘goal’, ‘intend’, ‘likely’ ‘may’, ‘plan’, ‘project’, ‘seek’, ‘should’, ‘strategy’ ‘will’, and similar expressions. The principal risks which could affect future operations of the Group are described in the ‘Risk Management’ section of the Group’s Annual Report and Consolidated Financial Statements. Factors that may cause actual and future results and trends to differ materially from our forward-looking statements include (but are not limited to): (i) our ability to deliver fixed price projects in accordance with client expectations and within the parameters of our bids, and to avoid cost overruns; (ii) our ability to collect receivables, negotiate variation orders and collect the related revenue; (iii) our ability to recover costs on significant projects; (iv) capital expenditure by oil and gas companies, which is affected by fluctuations in the price of, and demand for, crude oil and natural gas; (v) unanticipated delays or cancellation of projects included in our backlog; (vi) competition and price fluctuations in the markets and businesses in which we operate; (vii) the loss of, or deterioration in our relationship with, any significant clients; (viii) the outcome of legal proceedings or governmental inquiries; (ix) uncertainties inherent in operating internationally, including economic, political and social instability, boycotts or embargoes, labour unrest, changes in foreign governmental regulations, corruption and currency fluctuations; (x) the effects of a pandemic or epidemic or a natural disaster; (xi) liability to third parties for the failure of our joint venture partners to fulfil their obligations; (xii) changes in, or our failure to comply with, applicable laws and regulations (including regulatory measures addressing climate change); (xiii) operating hazards, including spills, environmental damage, personal or property damage and business interruptions caused by adverse weather; (xiv) equipment or mechanical failures, which could increase costs, impair revenue and result in penalties for failure to meet project completion requirements; (xv) the timely delivery of vessels on order and the timely completion of ship conversion programmes; (xvi) our ability to keep pace with technological changes and the impact of potential information technology, cyber security or data security breaches; (xvii) global availability at scale and commercially viability of suitable alternative vessel fuels; and (xviii) the effectiveness of our disclosure controls and procedures and internal control over financial reporting. Many of these factors are beyond our ability to control or predict. Given these uncertainties, you should not place undue reliance on the forward-looking statements. Each forward-looking statement speaks only as of the date of this document. We undertake no obligation to update publicly or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

This information is considered to be inside information pursuant to the EU Market Abuse Regulation and is subject to the disclosure requirements pursuant to Section 5-12 the Norwegian Securities Trading Act.

This stock exchange release was published by Katherine Tonks, Investor Relations, Subsea7, on 14 June 2024 at 13:50 CET.

Attachment ...


Read the full news release here

Related Articles

FILE PHOTO: A drilling rig on a lease owned by Oasis Petroleum performs logging operations in the Permian Basin oil and natural gas producing area near Wink, Texas U.S. August 22, 2018. Picture taken August 22, 2018. REUTERS/Nick Oxford/File Photo
FuelNatural Gas

US natural gas drillers to lift 2025 output, reversing year of cuts

Rising demand for natural gas exports should boost average annual gas prices...

People walk at the entrance of the venue of the United Nations climate change conference COP29, in Baku, Azerbaijan November 18, 2024. REUTERS/Murad Sezer
Climate FinancePoliticsUnited Nations

New proposals published on COP29 climate finance target

The goal of COP29 is to agree how much money richer countries...

FILE PHOTO: The Isla Bella, the first container ship to be powered by liquid natural gas, is pictured before her launch during a nighttime ceremony at General Dynamics NASSCO shipyard in San Diego, California April 18, 2015. REUTERS/Earnie Grafton/File Photo
EmissionsFuelLiquefied Natural GasMaritimeTransport

Container shippers hedging green transition with dual-fuel vessel orders

Decarbonizing shipping is crucial to global efforts to fight climate change because...

CourtsEconomyEmissionsLegislationPolitics

Judge puts stop to governor’s effort to remove Virginia from greenhouse gas initiative

Virginia formally exited the compact at the end of 2023, but the...

Login into your Account

Please login to like, dislike or bookmark this article.